A pilot project worth $12 million will be launched in Texas (Block and Block stream have invested $6 million each). A 3.8 MW photovoltaic solar battery and a 12 MWH Megapack energy storage device from Tesla will be installed at the facility. The hashrate will be 30 PH/s.
The construction of the enterprise will be completed at the end of 2022